Status Update for 2010.11.26

Anthony Hughes

In an effort to better manage my projects and workflow, I’m trying to blog my weekly status reports. Enjoy!

For more detailed information, please see my detailed status report.

Accomplishments

1. Proposal Reviews – reviewed Al’s BugzillaQA etherpad proposal, QMO3, Styleguide/Refactoring feedback, and Mozmill Doc-generation proposal

2. Vetted Email Backlog – vetted backlog of 350 emails left over from PTO.

3. Mozmill 1.5.1 Testday – assisted in moderating testday as well as helping people the identifying failures and running tests.

Note: I was away on vacation from Monday to Wednesday

Resolved Bugs

Bug 614973 – Expression is NULL failure in testPasswordNotSaved [mozilla1.9.1]

Next Week

Due to time on vacation last week, many of my projects are behind and need catching up.  This week my goal is to drive those projects to get caught up.

  • Automation
    • Fix open branch failure issues
    • Post Styleguide v1.0 to MDN
    • Break refactoring work into phases and create a project page
    • Create a project page for Local Data project
    • Create 1 / 4 needed Local Data testpages
    • Create 1 / 3 needed Panorama BFTs
  • Desktop
    • Migrate 4.0 testcases from spreadsheet to Litmus
    • Vet all Litmus results
    • Triage all in-litmus? bugs
    • Set up incoming queries for owned areas
    • Prepare testplans for 4.0b8 testing
    • Draft QA:Dev Partner proposal
    • Draft UTest proposal
  • Services
    • Plan Bugday for 4.0b8 cycle
    • Plan Testday for 4.0b8 cycle
    • Create lesson plan for Triaging in-litmus? Bugs
    • Create a project page for Bugday Portal
    • Draft a mockup for a Community Leaderboard on QMO

Time Breakdown

Percentage Time Spent

Time Spent vs Scoped

Historical Time Spent